<td id="4ea3t"><ruby id="4ea3t"></ruby></td>
  • <track id="4ea3t"><strike id="4ea3t"></strike></track>
    <p id="4ea3t"></p>
    <table id="4ea3t"><option id="4ea3t"></option></table>
  • 當前位置: 首頁 > 節能環保 > 垃圾發電

    華星東方承建的江蘇省鹽城市響水生物質發電項目煙氣凈化工程通過72+24小時試運行

    中國電力網發布時間:2022-07-13 11:17:34

    華星東方公司承建的江蘇省鹽城市響水生物質發電項目煙氣凈化工程于2021年6月25日通過72+24小時試運行。

    The flue gas cleaning (FGC) project undertaken by Huaxing East for Xiangshui, Yancheng biomass power plant passed the 72 + 24 hours trial operation on June 25, 2021.

    該項目新建1×130t/h高溫超高壓生物質循環流化床鍋爐,配1×30MW發電機組。煙氣處理采用旋風除塵+噴射干法脫硫+布袋式除塵工藝(包含脫硫劑存儲及輸送系統、工藝水系統等),為我司EPC工程。

    The plant built 1×130 t/h high temperature & ultra-high pressure biomass circulating fluidized bed boiler, and equipped 1×30 MW generator set. The FGC adopted cyclone dust removal + dry injection desulfurization + bag filter including reagent storage and conveying system, process water system, etc. The FGC is an EPC project of Huaxing.

    目前華星東方在江蘇省的業績涵蓋包括:錫東二期、無錫益多、淮安、鹽城大豐、連云港、宜興熱電、泰興、盱眙、宿遷、常州金壇、徐州、張家港等多個項目。

    The reference projects of Huaxing in Jiangsu include East Wuxi phase II, Yiduo Wuxi, Huai'an, Dafeng Yancheng, Lianyungang, Yixing thermoelectricity, Taixing, Xuyi, Suqian, Jintan Changzhou, Xuzhou, Zhangjiagang, etc.


    評論

    用戶名:   匿名發表  
    密碼:  
    驗證碼:
    最新評論0

    相關閱讀

    無相關信息
    人人超碰人人爱超碰国产|秘书高跟黑色丝袜国产91在线|国内少妇偷人精品免费|9久久无色码中文字幕

    <td id="4ea3t"><ruby id="4ea3t"></ruby></td>
  • <track id="4ea3t"><strike id="4ea3t"></strike></track>
    <p id="4ea3t"></p>
    <table id="4ea3t"><option id="4ea3t"></option></table>